Microsoft 365 Migration Checklist for Small Businesses

A Microsoft 365 migration checklist for small businesses: migration types, Canadian licence prices, DNS and cutover steps, security settings, timelines and costs.

Updated By YVR Technology

A Microsoft 365 migration moves your business email, calendars, contacts and files from where they live now, such as Google Workspace, a web host’s email, an office Exchange server or a shared drive, into Exchange Online, OneDrive, SharePoint and Teams. Much of the work is preparation: the right licences, access to your DNS, security settings and a clear plan for the moment mail starts arriving in the new system.

Microsoft’s own tools handle the common routes, and its estimates put the median time for a mailbox under 50 GB at one to two days. This checklist covers each stage in order, using Microsoft’s published limits and figures, so you can plan the move or check a provider’s proposal.

What a Microsoft 365 migration involves

Most small-business moves follow one of five routes, each with its own Microsoft tool and limits.

Moving fromMicrosoft’s routeKnow before you start
Google WorkspaceGoogle Workspace migration in the Exchange admin centre (mail, calendar, contacts, rules); Migration Manager for Google DriveA Google Cloud service account and mail-routing subdomains must be set up first
Hosted or IMAP emailIMAP migrationMoves mail only, not contacts, calendars or tasks; up to 500,000 items per mailbox and 35 MB per message; mailboxes must already exist
On-premises ExchangeCutover, express (minimal hybrid) or full hybrid migrationCutover supports up to 2,000 mailboxes, but Microsoft suggests 150 or fewer
File server or shared drivesMigration Manager or the free SharePoint Migration ToolFiles up to 250 GB; full paths up to 400 characters
Another Microsoft 365 tenant, after a merger or saleCross-tenant mailbox and OneDrive migrationA one-time Cross Tenant User Data Migration licence per user; a domain can belong to only one tenant
Common routes into Microsoft 365, from Microsoft Learn documentation

Migration Manager also moves content from Box, Dropbox and Egnyte. If you still run Exchange Server 2016 or 2019, note that Microsoft ended support for both on October 14, 2025, so they no longer get security fixes; Microsoft’s options are Microsoft 365 or Exchange Server Subscription Edition.

Choosing Microsoft 365 licences

The standard versions of all three business plans include business email, 1 TB of OneDrive storage per user and Teams, and together they’re capped at 300 users. The differences are the apps and the security tools.

PlanPaid yearlyMonthly subscriptionWhat it includes
Business Basic$9.50$11.40Web and mobile Office apps only; 100 GB mailbox and 50 GB archive
Business Standard$19.00$22.80Adds desktop apps on up to 5 PCs or Macs, 5 tablets and 5 phones per user
Business Premium$29.80$35.76Adds Intune device management, Defender for Business, Defender for Office 365 Plan 1, Conditional Access and a 1.5 TB archive
Microsoft 365 business plans with Teams, as listed on microsoft.com/en-ca in September 2026 (CAD per user per month, before tax)

Microsoft also sells versions without Teams or with Copilot, and prices change, so confirm before you buy. You don’t have to put everyone on the same plan, but Business Premium’s security and management benefits only apply to users with devices managed under it, and Microsoft recommends deploying it to all users if you choose it. Shared mailboxes such as info@ need no licence up to 50 GB, and admin-only accounts need none either.

Before you migrate: inventory, DNS and clean-up

Take an inventory

  • Mail: every user mailbox with its size, plus shared mailboxes, room and equipment calendars, distribution lists and aliases.
  • Files: each shared drive or folder, who can open or change it, and roughly how much it holds.
  • Devices and apps: computers and phones to set up, and any scanner, printer or software that sends email.

Confirm DNS and domain access

Make sure you can sign in to the registrar or DNS host for every domain you send email from. You’ll add a TXT record to verify each domain in Microsoft 365, then later change the MX, Autodiscover and SPF records. If your old provider also hosts your DNS, sort out access now rather than on cutover night.

Clean up and communicate

Delete or archive what nobody needs, and shorten deeply nested folders, because SharePoint and OneDrive allow at most 400 characters for the full path, including the file name. Microsoft also recommends turning off retention and archiving policies on the new mailboxes until migration finishes, since items they move or delete can be reported as missing. Then tell staff what will change and when: Microsoft’s own cutover process starts with that notice and ends with a welcome message explaining how to sign in.

Set a security baseline before cutover

Put sign-in security in place before mailboxes go live.

  • Security defaults or Conditional Access. Security defaults cost nothing and are on by default in new tenants. They make every user register for multifactor authentication (MFA), require MFA for admins and block legacy authentication. Conditional Access lets you write your own rules instead but needs Microsoft Entra ID P1, which Business Premium includes; if you use it, you switch security defaults off and replace them with policies.
  • Separate admin accounts. Microsoft recommends doing daily work from an ordinary account, keeping admin accounts few, giving each the least-privileged role that does the job and keeping at least two emergency access accounts that aren’t assigned to one person. Microsoft began enforcing MFA for the Microsoft 365 admin centre in February 2025.
  • Devices that send email. Legacy authentication includes older mail protocols, so a scanner or app that sends mail with just a username and password can stop working. Microsoft plans to disable Basic authentication for SMTP AUTH by default in existing tenants at the end of December 2026, so plan a supported method now.

For the wider set of controls, see our small business cybersecurity checklist.

Cutover methods, DNS changes and timing

Cutover, express or staged

A cutover migration moves every Exchange mailbox in one batch, typically over a few days, and Microsoft suggests it for 150 mailboxes or fewer. Express migration (minimal hybrid) moves Exchange 2010, 2013 or 2016 mailboxes over a couple of weeks or less. Staged migrations move batches of users over a few weeks or months, and full hybrid lets you move users gradually while both systems stay connected. IMAP and Google Workspace migrations keep syncing new mail until you complete them. Start with a small test group; Microsoft’s express migration guidance suggests two or three users.

DNS changes, in order

  1. Before the migration starts, lower the TTL on your MX records to 3,600 seconds (one hour) or less.
  2. Create users and mailboxes and start syncing data before you touch the MX record.
  3. Point the MX record to the value in the Microsoft 365 admin centre, and remove the old MX records or give them a lower priority.
  4. Add the Autodiscover CNAME so Outlook and phones find the new mailboxes, and merge Microsoft 365 into your existing SPF record so there’s still only one. Then set up DKIM and DMARC.
  5. Wait. Other mail systems can take up to 72 hours to see the new MX record. For a cutover, confirm a sync has run since mail started arriving directly before you delete the migration batch.

Timing and speed

Migrations often run after hours, Microsoft notes, when they can collide with backup jobs on your own servers. Speed depends on the source too: Google limits how much data can be pulled in a given period, and IMAP and simple Exchange migrations move 20 mailboxes at a time by default.

SourceMailbox of 0–10 GBMailbox of 10–50 GB
On-premises Exchange1 day (P90: 3 days)2 days (P90: 6 days)
Google Workspace, via the Exchange admin centre1 day (P90: 2 days)1 day (P90: 8 days)
Other IMAP email1 day (P90: 1 day)1 day (P90: 2 days)
Another Microsoft 365 tenant1 day (P90: 1 day)1 day (P90: 2 days)
Microsoft’s per-mailbox duration estimates from past customer migrations. P50 is the median; 90% of mailboxes finished within the P90 time.

After the move: devices, Teams and backup

Outlook, phones and shared mailboxes

With Autodiscover pointing to Microsoft 365, Outlook and mobile mail apps can find each mailbox, though Outlook may need a new profile after a cutover. Check versions as well: Office and Outlook 2016 and 2019 reached end of support on October 14, 2025, and Business Standard and Premium include the current desktop apps. Test every shared mailbox; each person who opens one needs an Exchange Online licence of their own.

Teams and SharePoint structure

Plan teams around who works together and who should see what, because each team comes with a Microsoft 365 group and a SharePoint site. Standard channels store files in that site, each private or shared channel gets its own site, and files shared in chats are stored in OneDrive. Known Folder Move puts users’ Desktop, Documents and Pictures folders in OneDrive; Microsoft recommends syncing no more than 300,000 files across all the libraries a person syncs.

Decommission carefully

Keep the old service until mail flow is confirmed and final syncs are done; once a cutover batch is deleted, mail still reaching the old server isn’t copied across. Then tidy DNS and cancel the old subscription. Before removing an Exchange server, read Microsoft’s decommissioning guidance: it recommends contacting Microsoft Support first, and organizations that keep syncing accounts from on-premises Active Directory have extra steps.

Retention isn’t the same as backup

Microsoft 365 keeps deleted data for fixed periods. Permanently deleted mail stays recoverable for 14 days by default, adjustable up to 30. SharePoint and OneDrive recycle bins hold items for 93 days, and Files Restore can roll a library back to any point in the last 30 days. Microsoft says its lagged mailbox database copies aren’t meant for recovering individual mailboxes or items, and it sells Microsoft 365 Backup as a separate pay-as-you-go product with recovery windows of up to two years. Decide how far back you need to restore, then pick a backup that reaches that far. Backup planning is part of our cybersecurity service.

What affects migration timeline and cost

There’s no standard price or schedule for a cloud migration; both scale with what you’re moving and how tidy it is.

Timeline

  • Data volume and shape: Microsoft notes that a 4 GB mailbox of 400 items with 10 MB attachments migrates faster than a 4 GB mailbox of 100,000 smaller items.
  • Method: a few days for a cutover, a couple of weeks or less for express migration, weeks or months for staged moves.
  • Source and network: throttling at the source, and your upload capacity when data leaves an office server.
  • Lead times: lowering DNS TTLs, the up-to-72-hour MX change, device setup and staff training.

Cost

  • Licences: the ongoing cost, from the plan table above, multiplied by users.
  • Tools: the SharePoint Migration Tool is free, cross-tenant moves need a one-time licence per user, and sources Microsoft’s methods don’t cover may need a partner or third-party software.
  • Labour: planning, clean-up, running and checking batches, fixing errors, setting up computers and phones, and supporting staff in the first days.
  • Related upgrades: replacing unsupported Office versions or computers, and adding backup.

When you compare quotes, check that each states the mailboxes, data volume, method, DNS work, device setup and after-migration support it assumes. For the ongoing side, see our managed IT services cost guide.

The printable migration checklist

Microsoft 365 migration checklist

  • List every mailbox, shared mailbox, calendar, distribution list and alias, with sizes.
  • Map shared drives, permissions and data volumes.
  • Confirm you can sign in to your domain registrar and DNS host.
  • Choose a plan per user; shared mailboxes and admin-only accounts need no licence.
  • Add and verify your domain in Microsoft 365.
  • Clean up old data and shorten paths longer than 400 characters.
  • Turn off retention and archiving policies on the new mailboxes until migration finishes.
  • Turn on security defaults or Conditional Access, and have every user register for MFA.
  • Create separate admin accounts and at least two emergency access accounts.
  • Find scanners and apps that send email, and plan how they’ll authenticate.
  • Lower MX record TTLs to 3,600 seconds or less.
  • Tell staff the schedule and what they need to do.
  • Migrate two or three test users, then everyone else.
  • Switch the MX record, add Autodiscover, update SPF, then set up DKIM and DMARC.
  • Allow up to 72 hours for the MX change and confirm a final sync before deleting batches.
  • Set up Outlook and phones, and test shared mailboxes.
  • Build Teams around how people work, and turn on Known Folder Move.
  • Choose a backup that goes beyond Microsoft’s built-in retention.
  • Decommission the old service once everything is verified.

If you’d rather hand off the work, YVR Technology plans and runs Microsoft 365 migrations for businesses across Greater Vancouver and the Fraser Valley. See our cloud services or contact us.

FAQ

Frequently asked questions

What is a Microsoft 365 migration?

It's the move of your email, calendars, contacts and files from another system, such as Google Workspace, a hosting company's email, an on-premises Exchange server or a file server, into Exchange Online, OneDrive, SharePoint and Teams. It also covers the work around the data: licences, DNS changes, security settings, setting up devices and retiring the old service. See our cloud services.

How long does it take to migrate a mailbox to Office 365?

Microsoft's estimates, based on past customer migrations, put the median at one day for a mailbox under 10 GB coming from Google Workspace, IMAP email, on-premises Exchange or another tenant, and one to two days for 10 to 50 GB. Some take longer: at the 90th percentile, a 10 to 50 GB Google Workspace mailbox took 8 days. Item counts, source throttling and network speed all play a part.

What is the best migration tool for Office 365?

It depends on the source. Microsoft's own tools cover the common routes: migration batches in the Exchange admin centre for Exchange, IMAP and Google Workspace email; Migration Manager or the free SharePoint Migration Tool for file shares; Migration Manager for Google Drive, Box and Dropbox; and cross-tenant migration between Microsoft 365 tenants. Microsoft suggests working with a partner when none of its methods fit.

How much does a cloud migration cost?

There's no standard price. The ongoing cost is licences: in September 2026, Microsoft's Canadian site listed Business Basic, Standard and Premium with Teams at CAD $9.50, $19.00 and $29.80 per user per month, paid yearly, before tax. One-time costs depend on the number of mailboxes, data volume, clean-up, the migration method, device setup and support afterwards, so ask for quotes that state those assumptions.

How long does a cloud migration take?

It depends on the method and the preparation. Microsoft describes a cutover migration as taking a few days, express migration a couple of weeks or less, and staged migration weeks or months. Around the data transfer, allow time for the inventory, clean-up, security settings, DNS changes, the up-to-72-hour MX record change and helping staff set up their computers and phones.

Is Microsoft 365 data stored in Canada?

For tenants provisioned in Canada, Microsoft's product terms commit to storing core data at rest in Canada: Exchange Online mailbox content, SharePoint site content and files, OneDrive files and Teams chat messages. An admin can confirm the committed data location in the Microsoft 365 admin centre under Settings, Org settings, Organization profile, Data location.

Get in touch

Book a free consultation

Tell us about your business and what you need from technology. We reply within one business day.

  1. 01

    Tell us what's going on

    Send the form or call. A rough idea of your team size and current setup helps us come prepared.

  2. 02

    A 30-minute conversation

    We ask about your people, systems and goals, and flag anything urgent we notice along the way.

  3. 03

    A written proposal

    Clear scope, a plain-English plan and pricing laid out line by line. Nothing starts until you approve it.

Prefer to talk it through?

(778) 819-0730

Monday – Friday, 8:00 am – 5:00 pm

No obligation. We reply within one business day.

Call nowBook a consult